Seismic Update Grant

May contain: text

Seismic retrofit work has stopped, pending some remodel work. Remaining work that needs to be done for the seismic project, primarily, relates to finish work, replacement of fixtures, sealing up walls and paint. We're in the final push to the finish line!

Seismic Retrofit Project Schedule - Draft

Preliminary Design Concept Sketches

CMGC RFP - Due Date December 23, 2015

RFP -  CMGC Seismic Retrofit Addendum

This is the paperwork for the Seismic Upgrade Proposal also included are notes from the pre-proposal meeting.

Seismic RFP Pre-Proposal Meeting

RFP Architectural Services Final

Included in the documents below are the blueprints and plans for Station 201 original construction from 1975 and the Annex addition in 2006.

201 Floor Plans, Cross section, Framing

201 Apparatus Room and East Wing

201 Elevations and Plot Plan

201 Foundation Plans

201 Framing Details

Annex Cross Section, Footings, Elevations

Annex Floor and Site plans, Facesheet